Produktbild: A Practical Guide to the NEC4 Engineering and Construction Contract

A Practical Guide to the NEC4 Engineering and Construction Contract

Aus der Reihe *Wiley-Blackwell

Fr. 152.00

inkl. gesetzl. MwSt., Versandkostenfrei


Beschreibung

Provides construction industry professionals with a practical and detailed guide to the NEC4 contract   The NEC contract takes a collaborative, project management based approach to construction projects, which is very different to the other standard forms of construction contract. This new edition of the...

Beschreibung

Provides construction industry professionals with a practical and detailed guide to the NEC4 contract
 
The NEC contract takes a collaborative, project management based approach to construction projects, which is very different to the other standard forms of construction contract. This new edition of the book covers all changes in the 4th Edition of the Engineering and Construction Contract, issued in June 2017, and will provide practical guidance to help users transitioning from NEC3 to NEC4.
 
Inside A Practical Guide to the NEC4 Engineering and Construction Contract, readers will find chapters on the background of the NECECC; contract data and other documents; the'spirit of mutual trust'; all of the individuals involved in the process (eg: project managers, clients, supervisors, subcontractors, etc.); communication issues, early warnings and other matters; quality management; titles; dealing with timing; payment processes; cost components; compensation procedures and assessments; dealing with terminations; dispute resolution; completing the contract and more.
* A practical guide to the application of the procedures contained in the newly issued NEC4 Engineering and Construction Contract
* Provides detailed guidance on the use of the agreement, which is claimed to offer increased flexibility, improved clarity and greater ease of use
* Written specifically for people actually using and administering the NEC contracts
* Features 3 appendixes covering tables of clause numbers, case law and statutes; employer's, project manager's, supervisor's, contractor's and adjudicator's actions; and communication forms and their uses.
 
First launched in 1993, the NEC has become one of the UK's leading standard forms of contract for major construction and civil engineering projects, making A Practical Guide to the NEC4 Engineering and Construction Contract a must-have resource for any contractor using the latest version of this contract.

Produktdetails

Einband

Gebundene Ausgabe

Erscheinungsdatum

16.11.2018

Verlag John Wiley & Sons Inc
Seitenzahl

400

Produktdetails

Einband

Gebundene Ausgabe

Erscheinungsdatum

16.11.2018

Verlag John Wiley & Sons Inc
Seitenzahl

400

Maße (L/B/H)

24.2/17.6/2.3 cm

Gewicht

888 g

Auflage

1. Auflage

Sprache

Englisch

ISBN

978-1-119-52251-5

Herstelleradresse

Libri GmbH
Europaallee 1
36244 Bad Hersfeld
DE

Email: gpsr@libri.de

Noch keine Bewertungen vorhanden

Verfassen Sie die erste Bewertung zu diesem Artikel

Helfen Sie anderen Kundinnen und Kunden durch Ihre Meinung.

Kundinnen und Kunden meinen

Bewertungen (0)

Die Leseprobe wird geladen.
  • Produktbild: A Practical Guide to the NEC4 Engineering and Construction Contract
  • 1 Introduction 1
     
    1.1 General 1
     
    1.2 Mechanics not law 2
     
    1.3 A simple formula for understanding a contract 3
     
    1.4 Mandatory or discretionary 4
     
    1.5 Conditions precedent 4
     
    1.6 Note on use of uppercase in keywords and phrases 5
     
    2 Background to the NECECC 7
     
    2.1 The background: First edition 7
     
    2.2 The second edition 8
     
    2.3 The third edition 9
     
    2.4 The third edition (reprinted) 9
     
    2.5 The fourth edition 9
     
    2.6 Endorsement of NEC3 by the Office of Government Commerce 10
     
    2.7 Endorsement by the Development Bureau, HKSAR Government 11
     
    2.8 General philosophy: Aims and objectives 12
     
    2.9 Flexibility 12
     
    2.10 Clarity and simplicity 13
     
    2.11 Stimulus to good management 14
     
    2.12 Other characteristics 15
     
    3 The Options: An Overview 17
     
    3.1 General arrangement of the ECC 17
     
    3.2 Other documents referred to 19
     
    3.3 Contract Data 20
     
    3.4 The published documents 20
     
    3.5 Main Options: General outline 21
     
    4 Spirit of Mutual Trust and Cooperation 25
     
    4.1 Introduction 25
     
    4.2 The clauses 25
     
    4.3 What does it mean? 27
     
    4.4 Practical issues 28
     
    5 The Cast of Characters 33
     
    5.1 Introduction 33
     
    5.2 The Client 33
     
    5.3 The Project Manager 35
     
    5.4 The Supervisor 38
     
    5.5 The Contractor 38
     
    5.6 The Senior Representatives 39
     
    5.7 The Adjudicator 40
     
    5.8 The Tribunal 41
     
    5.9 The Dispute Avoidance Board 41
     
    5.10 Subcontractors 42
     
    5.11 'Others' 42
     
    5.12 Named Suppliers 43
     
    5.13 Designers 43
     
    5.14 Principal Designer 44
     
    5.15 Principal Contractor 45
     
    5.16 Practical issues 45
     
    6 Communications, Early Warnings and other General Matters 47
     
    6.1 Introduction 47
     
    6.2 Communications:The clause 47
     
    6.3 Communications: Practical issues 49
     
    6.4 Early warnings: The clause 51
     
    6.5 Early warnings: Practical issues 53
     
    6.6 Other matters:The clauses 55
     
    6.7 Other matters: Practical issues 59
     
    7 The Contractor's Main Responsibilities 61
     
    7.1 Introduction 61
     
    7.2 Providing theWorks 61
     
    7.3 Contractor's design 62
     
    7.4 Information modelling 66
     
    7.5 Other matters 68
     
    7.6 Practical issues 72
     
    8 Subcontracting 75
     
    8.1 Introduction 75
     
    8.2 Definition of a Subcontractor 75
     
    8.3 The core clauses 76
     
    8.4 Provisions in the Main Options 76
     
    8.5 Practical issues 77
     
    8.6 Options for forms of subcontract in the NEC4 family 78
     
    9 Quality Management 81
     
    9.1 Introduction 81
     
    9.2 Quality management system 81
     
    9.3 Tests and inspections 82
     
    9.4 What is a Defect? 84
     
    9.5 The Defect procedure 84
     
    9.6 The Defects Certificate 86
     
    9.7 Uncorrected Defects 87
     
    9.8 Practical issues 87
     
    10 Title 91
     
    10.1 Introduction 91
     
    10.2 The core clauses 91
     
    10.3 Practical issues 92
     
    11 Liabilities and Insurance 95
     
    11.1 Introduction 95
     
    11.2 The core clauses 95
     
    11.3 Secondary options 98
     
    11.4 Practical issues 99
     
    12 Time 101
     
    12.1 Introduction 101
     
    12.2 The programme: Contents 102
     
    12.3 The programme: Submitting, accepting and revising 107
     
    12.4 The programme: Practical issues 110
     
    12.5 Starting and finishing 118